Gund Kilam Bridge work inspected

District Commissioner (DC) Kulgam, Showkat Aijaz Bhat Monday visited Ashmuji to take stock of ongoing work on Gund Kilam Bridge.

The DC was informed that the total project cost of this 11 span bridge is 14.57 crore and work on 9 spans is completed in all respects besides slab on 10th span will be laid this week.

   

Leave a Reply

Your email address will not be published. Required fields are marked *

nineteen − one =