Central, north Kashmir parts to face power shutdown

Office of the Power Controller Kashmir on Friday said that there will be shutdown of various 33kV lines in different areas of Srinagar, Baramulla, Ganderbal, Budgam and Bandipora for carrying out stabilisation and branch cutting.

“In Srinagar 33kV Cheshmashahi-TRC and Cheshmashahi-Centaur Line andCheshmashahi-Shalimar and Cheshmashahi-Nishat Lines will be shut down on27-04-2019 and 29-04-2019 respectively from 9.00 am to 5.00 pm,” said anofficial handout.

   

“In Baramulla 33kV Amargarh Pattan line will be shut down on 27-28 April2019, HMT line on 29-30 April 2019, Kangundara line on 01 May 2019, DeiinaWagoora line on 02-03 May 2019, Uri Line on 27-28 April 2019, Boniyar Line on29 April 2019, Watergam Line on 30 April 2019, Malpora Line on 01 May 2019,Delina Line on 02 May 2019, Baramulla Ist, IInd and MES on 03 May 2019, PattanAmargarh line on 27-28 April 2019, HMT line on 29-30 April 2019, KongamdaraLine on 01 May 2019, Delina-Wagoora line on 02-03 May 2019 and NehalporaGulmarg line on 4 – 5 May 2019  from9.00am to 5.00 pm.”

In Ganderbal and Bandipora, 33kV Safapora line and Shadipora Tap linewill be shut down on 29 March and 04 May 2019, Markundal Line on 04 and 07 May2019, Hajin Tap line on 29 April 2019, Preng Tap Line and HCC Bandipora on 29April and 04 May 2019 from 10.00 am to 6.00 pm.

Furthermore, 33kV Pampore BK Pora and Pampore-Nagam Char Sharif from 27 –28 April  2019, Arizal tap line from29-30 April 2019, Shariefabad Narbal line on 28 April 2019, Narbal Snoor(including Mazhama Tap) on 30 April 2019, Budgam-Ichgam-Kremshore line,Budgam-Waterhal line and Budgam-Ichgam-Chadoora line on 29 April and 01 May2019, Budgam-Sidco line on 30 April 2019, Shariefabad-Wadwan line on 01 May2019 and Ahmadpora-Magam-Khag Tap line on 02 April 2019 from 08.00am to 08.00pm.

The power supply to the fed areas will be affected during the said dateand time.

Leave a Reply

Your email address will not be published. Required fields are marked *

4 × 2 =