Power shutdown in Srinagar areas on February 26

Power controller, Kashmir Province, PDD Srinagar today said to raise the height of 33KV Airfield line near Awantipora Bypass, power supply from Awantipora-Airfield 33 KV line to the summer capital areas shall remain affected on February 26 from 10 am to 4 pm.
Power shutdown in Srinagar areas on February 26

Power controller, Kashmir Province, PDD Srinagar today said to raise the height of 33KV Airfield line near Awantipora Bypass, power supply from Awantipora-Airfield 33 KV line to the summer capital areas shall remain affected on February 26 from 10 am to 4 pm.

"Similarly, due to some technical snag in 2×6.3 MVA, 33/11KV receiving station Peerbagh, the power supply shall remain partially affected in the areas of Peerbagh, Friends Enclave, Cooperative colony, Humhama, Baghwanpora, Nadroo, Jeelanabad ,Umerabad and Rehmatabad from today," the controller said in a statement. 

Related Stories

No stories found.
Greater Kashmir
www.greaterkashmir.com